Hi There, PlusSpec team, hope you guys are well?
Just seeing if we can get some consistency with the takeoff features and functions or whether there is a beg etc.
Happy for you test with my setup anytime before you adjust a version.
After installing the new beta version, I’ve basically had to go through each cost category/ tag and re assign and save the recipe again to the material that I have done before in the past.
I also changed and took off advance framing setting and then lost all the assigned recipes to all the cost codes above the framing tag when it refreshed.
Is it possible also to save the Wastage factor value for each material? I feel like you get it dialed in see how it goes on site and bang its gone and you have to try to work out what you had again as it gets wiped every new job or 80% of it.
You can see in the image there is no value on a couple of items reading 0 in some of them yet one reads 16 items (Span tec B150-20 and the other Trimming beam - (roof frame 240 x 45 h2 MGP10 reads 0 also and show 4 items
Please please can we get the wastage value saved and remains consistent and you have to adjust where required from previous saved values as you build out your library rather than having to try to add wastage everytime?
I think one of the most powerful things about this software is the automation power if you assign recipes to a material however, with updates I feel like its back to square one.
This is the only software that I know that you can get Live pricing and easy to work out a design change and scope/ inclusion amendments.